基于BP神经网络的输电线路工程造价预测模型研究Study on BP neural network based prediction model for power transmission line project cost
孙安黎,向春,伍焓熙
摘要(Abstract):
针对输电线路工程前期项目比选种类多,造价估算偏差大,如何利用少量信息得到较准确工程造价的问题,结合BP神经网络算法构建了输电线工程造价预测模型。其以工程造价的影响因素作为BP神经网络的输入,通过3层网络结构,得到输电线路工程造价估计值。最后采用实际工程数据对提出的输电线工程造价预测模型进行实验仿真,得到的实验结果显示,该模型能准确估计工程造价,从而适合于评估工程前期比选方案的优劣。
关键词(KeyWords): 输电线路;工程造价;BP神经网络;造价估算;预测模型;实验仿真
基金项目(Foundation): 国家自然科学基金青年基金项目(60902079)~~
作者(Author): 孙安黎,向春,伍焓熙
DOI: 10.16652/j.issn.1004-373x.2018.02.020
参考文献(References):
- [1]SIMON Haykin.神经网络原理[M].叶世伟,史忠植,译.北京:机械工业出版社,2004.Haykin S.Neural network principle[M].YE Shiwei,SHI Zhongzhi,translation.Beijing:Mechanical Industry Press,2004.
- [2]王洪元,史国栋.人工神经网络技术及其应用[M].北京:中国石化出版社,2003.WANG Hongyuan,SHI Guodong.Artificial neural network technology and its application[M].Beijing:China Petrochemical Press,2003.
- [3]黄宇峰.城市中压配电网可靠性快速评估及预测方法的研究[D].北京:华北电力大学,2011.HUANG Yufeng.Study on fast assessment and prediction method for reliability of urban medium voltage distribution network[D].Beijing:North China Electric Power University,2011.
- [4]于群,朴在林,胡博.基于EEMD和BP神经网络的短期光伏功率预测模型[J].电网与清洁能源,2016,32(7):132-137.YU Qun,PIAO Zailin,HU Bo.A hybrid model for short-term photovoltaic power prediction based on EEMD-BP combined method[J].Power system and clean energy,2016,32(7):132-137.
- [5]周英,尹邦德,任铃,等.基于BP神经网络的电网短期负荷预测模型研究[J].电测与仪表,2011,48(2):68-71.ZHOU Ying,YIN Bangde,REN Ling,et al.Study of electricity short-term load forecast based on BP neural network[J].Electrical measurement&instrumentation,2011,48(2):68-71.
- [6]胡西民,支沛,姚李孝,等.基于BP神经网络的电网综合评价研究[J].电网与清洁能源,2016,32(9):77-82.HU Ximin,ZHI Pei,YAO Lixiao,et al.Research on power grid comprehensive evaluation based on BP neural network[J].Power system and clean energy,2016,32(9):77-82.
- [7]高丽媛,董甲.基于改进BP神经网络的洪峰预测模型[J].电子科技,2015,28(3):41-43.GAO Liyuan,DONG Jia.Flood prediction model based on improved BP neural network[J].Electronic science and technology,2015,28(3):41-43.
- [8]ADAMEC M,PAVLATKA P,STARY O.Costs and benefits of smart grids on liberalized markets[J].Journal of electronic science and technology,2012,10(1):22-28.
- [9]DUKIC D,MARIC T,BABIC D.Analysis of duration and cost estimate of construction projects through computer simulation[C]//Proceedings of International Conference on Information Technology Interfaces.Cavtat:IEEE,2007:25-28.
- [10]CORNFORTH D.Role of microgrids in the smart grid[J].Journal of electronic science technology,2011,9(1):9-16.